INSTALLTION OF A NEW STEERING BLOCK WITH CABLE ROUTING FOR AN ATALS MOBILE EXCAVATOR

Based on the 2D drawing data, the installation environment was modeled with Solid-Edge®, the optimal installation location for the control block was determined and the required mounting console was constructed. The piping was then constructed and the pipes were manufactured by Interhydraulik. The sample set-up was carried out by Interlog / Ingessta in Selm and taken by TEREX-ATLAS. The final acceptance took place on a prototype at the manufacturer.

ATLAS GMBH

Atlas GmbH develops and manufactures handling equipment, mobile-, two-wheeled and tracked excavators up to a service weight of just under 100t at the Ganderkesee site.